PLC-HUB
P-R-D35-TT
PLC-HUB adopts 6P D35 guide rail mounting case, and the three-phase electrical wiring method is used to relay the power line carrier signal to improve the power line carrier cross-phase capability.
VEGA Integration Corporation
12F., No. 135, Sec. 2, Jianguo N. Rd., Zhongshan Dist., Taipei City 104476 , Taiwan